ANALISIS ERGONOMI DAN CYCLE TIME PADA ALAT PENGADUK CEMENT MARKING

Authors

  • Indah Puspa Murni, S.T., M.Sc.
  • Henry Prasetyo S.Si., M.T.
  • Dayang Jingga Amora
  • Lukman Hadi Sutrisno

Keywords:

Ergonomics, Cycle Time, Mixer, Cement Marking, RULA

Abstract

This study analyzes the ergonomics and cycle time of the cement marking mixer at PT XYZ. Ergonomic evaluation using the Rapid Upper Limb Assessment (RULA) method identified the operator's posture with an initial score of 7, indicating a high risk of injury. After the design and implementation of the automatic mixer, the RULA score decreased to 3, indicating a significant improvement in working posture. Additionally, the cycle time for the cement mixing and screening process was reduced from 4.29 minutes to 2.6 minutes. This automatic mixer not only improves operational efficiency but also reduces the risk of musculoskeletal disorders for the operators. The results of this study highlight the importance of applying ergonomic principles and automation in the manufacturing industry to enhance workplace safety and productivity.

 

Published

2026-10-07

How to Cite

ANALISIS ERGONOMI DAN CYCLE TIME PADA ALAT PENGADUK CEMENT MARKING. (2026). Journal of Industrial Technology Science, 6(1). https://justin.poltek-gt.ac.id/ejournal/article/view/105

Similar Articles

1-10 of 39

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)