ANALISIS ERGONOMI DAN CYCLE TIME PADA ALAT PENGADUK CEMENT MARKING
Kata Kunci:
Ergonomics, Cycle Time, Mixer, Cement Marking, RULAAbstrak
This study analyzes the ergonomics and cycle time of the cement marking mixer at PT XYZ. Ergonomic evaluation using the Rapid Upper Limb Assessment (RULA) method identified the operator's posture with an initial score of 7, indicating a high risk of injury. After the design and implementation of the automatic mixer, the RULA score decreased to 3, indicating a significant improvement in working posture. Additionally, the cycle time for the cement mixing and screening process was reduced from 4.29 minutes to 2.6 minutes. This automatic mixer not only improves operational efficiency but also reduces the risk of musculoskeletal disorders for the operators. The results of this study highlight the importance of applying ergonomic principles and automation in the manufacturing industry to enhance workplace safety and productivity.