ANALISIS ERGONOMI DAN CYCLE TIME PADA ALAT PENGADUK CEMENT MARKING

Penulis

  • Indah Puspa Murni
  • Henry Prasetyo S.Si., M.T.
  • Dayang Jingga Amora
  • Lukman Hadi Sutrisno

Kata Kunci:

Ergonomics, Cycle Time, Mixer, Cement Marking, RULA

Abstrak

This study analyzes the ergonomics and cycle time of the cement marking mixer at PT XYZ. Ergonomic evaluation using the Rapid Upper Limb Assessment (RULA) method identified the operator's posture with an initial score of 7, indicating a high risk of injury. After the design and implementation of the automatic mixer, the RULA score decreased to 3, indicating a significant improvement in working posture. Additionally, the cycle time for the cement mixing and screening process was reduced from 4.29 minutes to 2.6 minutes. This automatic mixer not only improves operational efficiency but also reduces the risk of musculoskeletal disorders for the operators. The results of this study highlight the importance of applying ergonomic principles and automation in the manufacturing industry to enhance workplace safety and productivity.

 

Unduhan

Diterbitkan

2026-10-07

Cara Mengutip

ANALISIS ERGONOMI DAN CYCLE TIME PADA ALAT PENGADUK CEMENT MARKING. (2026). Jurnal Sains Ilmu Teknologi Industri, 6(1). https://justin.poltek-gt.ac.id/ejournal/article/view/105

Artikel Serupa

31-39 dari 39

Anda juga bisa Mulai pencarian similarity tingkat lanjut untuk artikel ini.

Artikel paling banyak dibaca berdasarkan penulis yang sama